How does the field gets the work? Logistics is not just office support.

 SheGetItDone
Not A Writer


How Construction Logistics Managers sees work everyday?

Logistics management in construction

Logistics management is the process of planning, implementing and controlling supply chain resources, generally from the point of origin, such as raw material accumulation, to the point of destination, i.e. delivering goods to the correct location on the construction site.

Effective logistics management is important can enhance efficiency and productivity, having a positive overall impact on cost and time. For example, good logistics management ensures the workforce are able to carry out required activities without delays caused by materials being delivered to site.





Logistics management involves the integrating of many activities:
Resource assessment.
Lead time assessment.
Supply and demand planning.
Sourcing and procurement.
Production planning and scheduling.
Inventory management and order fulfillment.
Inbound and outbound transport management.
Warehousing.
Materials handling.
On site vehicle and plant management.
Customer services.

Having a timeline of project stages planned in advance, with a full inventory of materials and tools required, is a key part of logistics management. Due to the complexity of the process, and the interaction of many supply streams, dedicated simulation software can be used to model, analyse, visualize and optimize logistics.

In addition to keeping the construction  on-schedule, other advantages of good logistics management include:
Cost savings and waste reduction as productivity is enhanced.
Logistical planning on site enables materials to be stored correctly which improves efficiency and reduces the potential for damage
Sites can be kept safe, clean and easy to move around.
Deliveries can be received and handled promptly.


SheGetItDone wants this to this happen? 

Construction consolidation centers (CCC) can be used as a part of logistics management. These are locations near to but not necessarily on site, to which deliveries are made and stored. They are then brought to the site on a ‘just in time’ basis as and when required. This has the advantage of keeping the site clear of obstacles, cutting down on required storage space, and ensures that the logistics manager is aware that the materials are available close-at-hand.


Typically, a construction logistics manager will be responsible for the logistics supply chain. The main responsibilities of a logistics manager will include the coordination of the workforce, goods and equipment at the construction site. They should engage with the project planner, commercial management and construction manager to ensure that all activities are properly coordinated across the project.

It's not a easy job but somebody has to do it, buildings and infrastructure have to get build.